Public, Built, 2010 Dmitri . Public, Built, 2010 Dmitri .

The Israel Museum

 

Year: 2003-2010
Site area: 80,000 sqm
Pre-existing built area: 50,000 sqm
New built area: 6,000 sqm
Construction budget: 100,000,000 USD
Client: The Israel Museum
Status: Built
Original architect: Al Mansfeld and Dora Gad
Collaboration: James Carpenter Design Associates
CD: A. Lerman Architects
Team: Carmit Harnik Saar, Ruth Kedar, Rinat Shteinlauf, Hila Rak-Broides, Dan Koniac, Charlotte Mottahedeh.
Project Management: Nizan-Inbar Project Management Ltd.
Structural Engineering: J. Kahan & Partners.

Project Description

The renewal of the Israel Museum in Jerusalem is a project of renovation, reorganization and expansion of the national museum designed by architects Al Mansfeld and Dora Gad in a 1959 competition and opened in 1965. The original museum was conceived as an open-ended accumulative system with inbuilt possibilities to evolve and mutate within a fixed grid and according to modular increments.

Indeed, the prospect of unrelenting growth has proved justified and the museum has multiplied its floor area ten times within about 40 years without losing its mathematical composition. 

The incredible growth of the museum has brought it to the brink of an organizational and operational collapse. While the initial design system had been successful in maintaining the appearance of formal coherence, internally the colossal structure became unsustainable, out of scale and at odds with its own program.

We were commissioned to draft a new master plan for the museum in order to resolve the internal organizational problems, reorganize the entrance and circulation system and speculate on potential areas for further expansion.

Our proposal was based on a subtle strategic intervention that consolidated the existing cellular structures and added missing links that would allow the museum complex to function again. The intervention included a new entrance and ticket pavilion with a generous forecourt; an inserted passage leading to a new core element from which all internal galleries and departments of the Museum are accessed; reorganization of all galleries for better accessibility, orientation and visibility; and finally preservation work which included rehabilitation of external stone facing and internal exposed concrete surfaces and restoration of natural lighting in the exhibition spaces.

All stages, from conceptual master plan to internal fit out, have been carried out on schedule and on budget. The Israel Museum re-opened to the public on July 2010.

With the conclusion of the project, EKA is proud to put forward two unusual achievements: First, albeit the massive structural, spatial and material transformations, the museum has kept its original sense of place, set of proportions and spatial flow. Second, while adding less than 10% to the existing envelope of the museum, we managed to double its exhibition area by considerably improving its internal performance.

 
Read More
Public, Built, 2006 Dmitri . Public, Built, 2006 Dmitri .

Ghetto Fighters’ House Museum

 

Location: Kibbutz Lohamei Ha’Ghettaot
Year: 2003 - 2006
New addition: 1,500 sqm
Status: Built
Client: Ghetto Fighters' House Museum
Original architect: Samuel Bikeles
Team: Dror Aviram, Keren Avni, Rinat Calev
Project Management: Barnea Engineering and Building Ltd.
Structural Engineering: Kidan Structural Engineering Ltd.
Competition: Winning Entry

Project Description:

The Museum was built in the 50’s by the founders of Kibbutz Lohamei Ha’gettaot, whose entire population were survivors of the holocaust. The members wanted to establish a place for ongoing testimony and education concerning the holocaust and the rebellion of the Warsaw Ghetto.

GFH was built as an active repository of first-hand testimonies and personal biographies, asking to memorize history as a continuous present, and to emphasize the relation between individual testimonies and the collective experience. The big narrative offered by other museums is here toned down into direct, subjective, spoken, intimate and unmediated meeting of the speakers and the listeners of the testimony. For us, the architectural task was clear, but rather unusual: how to maintain the existing building and to keep it as a reverberation chamber of live testimonies, when the transmitters themselves are no longer there to meet the visitors and guide them through the building. In other words, the conceptual challenge was not to reproduce or simulate, but rather to re-enact the original situation of GFH.

 
Read More